5 Te Awakura Tce

CLIENT: IAG
PROJECT: 5 Te Awakura Tce
JOB TYPE: Civil Construction
ESTIMATED DURATION: 12 Weeks
VALUE: $100,000.00

Replacement of earthquake damaged retaining walls in Mt Pleasant:
Initially all walls were designed as timber however shallow rock not previously detected instigated a design change for the main wall. The wall is designed to retain the driveway and single garage and also provides the main access into the proposed new dwelling. The significant reinforced concrete is cast upon a compacted gravel raft taken to the bedrock.