Client: Ministry of Education

Project: Cathedral Junior School.

Job Type: Asbestos Removal & Demolition

Estimated Duration: 120 Days

Value: $230,000.00

Description:

Ground Remediation

Scope Civil and Drainage were approached by Contract Construction to undertake demolition, excavation, ground stabilization and drainage works. The ground stabilization involved the construction of a large cement reinforced gravel raft. Construction materials were subject to rigorous lab testing prior to; and site field-tests during construction. On site, our construction methodology was the key to achieving the high standard of performance required by the site Engineers. Materials and systems were continuously performance tested and sampled to ensure quality was maintained.

During excavation for the gravel raft, buried asbestos and an artisan well were discovered. Our previous experience in dealing with both of these issues allowed us to deal with the situation quickly and efficiently thus maintaining our programme and meeting our deadlines.

Client: Ministry of Education

Project: St Albans Playcentre Carpark.

Job Type: Drainage, Earthworks, Siteworks, Kerb & Channel Services

Estimated Duration: 12 Weeks

Value: $305,000.00

Description:

Construction of Carpark and Right of Way (Including Services)

Scope Civil and Drainage were contracted by the Ministry of Education to install a new carpark and right of way for the St Albans Playcentre.

This contract included new roading, sewer & stormwater drainage, footpath construction, landscaping and service relocation. The programme was 12 weeks with health and safety playing a large role due to the preschool being open during the contract.

Client: IAG

Project: 5 Te Awakura Tce.

Job Type: Civil Construction

Estimated Duration: 12 Weeks

Value: $100,000.00

Description:

Replacement of earthquake damaged retaining walls in Mt Pleasant:
Initially all walls were designed as timber however shallow rock not previously detected instigated a design change for the main wall. The wall is designed to retain the driveway and single garage and also provides the main access into the proposed new dwelling. The significant reinforced concrete is cast upon a compacted gravel raft taken to the bedrock.