13 Woodlau Rise

CLIENT: Seque
PROJECT: 13 Woodlau Rise
JOB TYPE: N/A
ESTIMATED DURATION: 14 Days
VALUE: N/A

Scope Demolition was contracted by the owner of the property to demolish their three storey, split level dwelling due to damage caused by the earthquakes. The steepness of the slope and difficult site access meant that the demolition had to be done in a controlled fashion using two 20T excavators. The dwelling, all hard surfaces and associated structures including retaining walls were removed to allow the site to be developed for a new house.