Cathedral Junior School

CLIENT: Ministry of Education
PROJECT: Cathedral Junior School
JOB TYPE: Asbestos Removal & Demolition
ESTIMATED DURATION: 120 Days
VALUE: $230,000.00

Scope Civil and Drainage were approached by Contract Construction to undertake demolition, excavation, ground stabilization and drainage works. The ground stabilization involved the construction of a large cement reinforced gravel raft. Construction materials were subject to rigorous lab testing prior to; and site field-tests during construction. On site, our construction methodology was the key to achieving the high standard of performance required by the site Engineers. Materials and systems were continuously performance tested and sampled to ensure quality was maintained.

During excavation for the gravel raft, buried asbestos and an artisan well were discovered. Our previous experience in dealing with both of these issues allowed us to deal with the situation quickly and efficiently thus maintaining our programme and meeting our deadlines.